APM Terminals Aarhus
Cycle Time Diagnostics
Overview
Cycle time control tower
Loading high-level cycle time view.
Current signal
What needs attention?
Driver shortlist
Strongest signals
Exception Queue
Top deviation periods
Time split
Productive time vs delay
Action preview
Where to investigate first
Find out why
Find out why cycle time moved before the next lift.
Loading current cycle time story.
Step 1
Spot the Deviation Hour
Hourly GCT with one baseline for all comparisons
Exception Queue
Top 5 Deviation Hours
Ranked by excess seconds, weighted by lift volume
Step 2
Explain the Selected Hour
Pick the operational lens. Pareto X-axis is GCT; Y-axis is the selected split.
Top Contributors
X-axis is GCT sec/lift. Bars are ordered by excess contribution.
Three Strongest Signals
Automatically ranked dimensions for the selected period
Percentage View
Operational Drivers in the Selected Period
Click any card to flip between the two operational sides. Each face shows pair share, lifts, and GCT.
Step 3
Break GCT Into Productive Time and Delay
Actual MudaCat bucket split from the loaded data.
Step 4
Action Shortlist
Top contributors plus bias checks before assigning a root cause.